Tuesday edition
November 24, 2026
NEW BRUNSWICK / MAINE — NOVEMBER 20 BUYER BULLETIN
Before You Cut, Know Who Will Take the Wood
Two changes in the SNB Forest Products Marketing Board’s November 20 bulletin show why an outlet needs checking before a harvest starts. Woodland Pulp in Maine resumed hardwood pulpwood buying after a softwood run. Separately, the board’s defined contract with Louisiana-Pacific in Houlton, for eight-foot poplar through December 31, lost its fuel surcharge effective November 23. Producers who committed volume are asked to coordinate deliveries and trucking with the board.
Those are specific purchasing and contract conditions, rather than general bids available to every supplier. Before cutting, confirm accepted species, dimensions and grades, contamination limits, allocation and delivery slots, haul costs and any fuel surcharge. Identify a fallback outlet for material the primary buyer cannot take.
Keep the products separate: roundwood pulpwood, chips and mill residuals, and manufactured lumber have different customers. Pallet stock and ties must meet their own specifications; urban wood acceptance and mass-timber lumber grades do not make either a generic destination for pulpwood.
By the Numbers
Latest available observations as of 2026-11-24. Dates and comparison periods vary by series; monthly figures remain unchanged between releases.
| Indicator | Latest | Change |
|---|---|---|
| U.S. on-highway dieselEIA U.S. on-highway diesel; taxes included | US$5.94/galWeek of November 16, 2026; released November 17 | −US$0.19/gal −3.1%Versus November 9: US$6.13/gal |
| Lumber futuresJanuary 2027 lumber futures (CME LBRF27) | US$541.00/MBFNovember 23, 2026 settlement | UnavailableNovember 16 January settlement not independently verified; checked November 24 |
| Madison’s lumber indexMadison’s weekly lumber index | US$440.00/MBFWeek ending November 20, 2026 | −US$4.00/MBF −0.9% (calculated)Versus week ending November 13: US$444.00/MBF |
| Hardwood lumber PPIBLS WPU0812; 1982=100; not seasonally adjusted | 284.3 index pointsOctober 2026; released November 13 | −1.3 points −0.4%Versus September 2026: 285.6 |
| U.S. single-family housing startsCensus U.S. single-family starts; annualized estimate | 864,000 units (SAAR)October 2026; released November 18 | +33,000 units (SAAR) +4.0%Versus revised September 2026: 831,000 |
| Canadian dollarBank of Canada; Canadian dollars per U.S. dollar | C$1.44 per US$1.00Daily average, November 23, 2026 | +C$0.00 per US$1.00 +0.3%Versus November 20: C$1.43 per US$1.00 |
About these numbers
Housing starts are annualized estimates, not actual monthly units, and are subject to revision. The hardwood PPI is an index, not a dollar price. Exchange rates are daily averages. MBF means thousand board feet. The October single-family starts monthly change has a published ±9.0-percentage-point 90.0% confidence interval and is not statistically significant. The named January 2027 lumber contract settled at US$541.00 on November 23. Its November 16 settlement was not independently confirmed; the continuous historical series is not substituted. The latest EIA diesel observation is November 16; a further release is scheduled later November 24. Display rounding follows the approved format. Changes are calculated from unrounded observations, so rounded currency levels may look unchanged even when a small movement occurred.
Sources:
EIA U.S. on-highway diesel; taxes included
Investing.com named-contract table
Madison’s November 20 index
BLS hardwood lumber PPI via FRED
Census U.S. single-family starts; annualized estimate
Bank of Canada daily averages
Trade Policy Watch
- Commerce’s November 23 notice records two November 18 requests for USMCA panel review of the 2024 Canadian softwood-lumber countervailing-duty results, under case USA–CDA–2026–10.12–01. The notice sets December 18 for complaints and January 4 for notices of appearance by participating interested parties. This opens a review proceeding; it does not announce a panel ruling or cancel the applicable duty deposits. It is separate from the original-investigation challenge reported earlier this month. Commerce: new review requests and procedural deadlines
Working Forests & Wood Supply
GREAT LAKES — LOGGING CAPACITY / NOVEMBER 23 REPORT
Michigan’s wood supply depends on the crews that can deliver it
Michigan State University forest economist Shivan Gc told Capital News Service that losing local logging capacity could make mills seek wood farther away, increasing transportation costs even when manufacturing continues. The November 23 report connects a study of logging’s economic contribution with interviews about equipment costs, weak markets and longer hauls.
The researchers’ loss-of-capacity models are scenarios, not predictions of company closures. The distinction matters to buyers: keeping a mill running and retaining a dependable local harvesting supply chain are different measures of industry health.
Action Detector
U.S. — RESTORATION-WOOD PROCESSING / EXISTING LOAN PROGRAM
TPEP remains outside USDA’s separate B&I submission pause
USDA’s November 20 lender FAQ explicitly excludes the Timber Production Expansion Guaranteed Loan Program (TPEP) from the separate Business & Industry submission pause. Approved lenders can use TPEP for qualifying projects that establish, reopen, expand or improve a sawmill or other wood-processing facility using National Forest System restoration byproducts. Its FAQ specifies a 90% guarantee to the lender; this is a loan program, not a grant or a promise of approval.
Start with USDA’s priority-area map and an approved lender. The governing notice defines proximity as within 250 miles of a high- or very-high-priority restoration area, but also requires qualifying restoration byproducts, significant federal or Tribal raw material and a substantial reduction in restoration costs. Location alone does not establish eligibility.
USDA: TPEP and approved-lender route → · Program FAQ: guarantee and underwriting → · November 20 lender FAQ: B&I pause distinction → · USDA priority-area screening map → · Governing notice: sections A.1 and C.2–3 →
Under the Radar
CANADA — ONTARIO / OPEN RAILWAY-TIE PROCUREMENT
Ontario Northland’s tie purchase comes with four addenda
Ontario Northland’s RFQ 2026 082 for supply and delivery of railway ties closes November 30 at 2 p.m., according to its current listing. Four addenda accompany the October 29 solicitation, including one dated November 23.
The agency requires all documents to be downloaded. Interested suppliers should obtain the packet and amendments through its access form and confirm the applicable tie specifications and submission instructions. This is a purchase of specified railway ties, rather than an outlet advertised for unsorted logs or pulpwood.
Ontario Northland: solicitation, access form and all four addenda →
Today's Featured Resource
14-day VT Forestry Climate Adaptation Challenge
This free 14-day email course delivers daily units with podcast links about Vermont forestry climate adaptation. The sequence offers a structured way to work through the subject over two weeks.
Useful enough to pass along?
Share today’s edition with a colleague.
Publish a newsletter? Get a ready-to-paste Woods Run blurb →